# How to install QCW leveling feet

**URL:** https://forum.onefinitycnc.com/t/how-to-install-qcw-leveling-feet/12571
**Category:** QCW/WallMount
**Created:** [April 19, 2022, 6:36pm UTC](https://forum.onefinitycnc.com/t/how-to-install-qcw-leveling-feet/12571 "2022-04-19T18:36:52Z")
**Posts on this page:** 1
**Page:** 1

<div class="post-metadata">

### Author: ![OnefinityCNC](https://sea2.discourse-cdn.com/flex022/user_avatar/forum.onefinitycnc.com/onefinitycnc/32/7_2.png) [@OnefinityCNC](https://forum.onefinitycnc.com/u/OnefinityCNC)
#### Post date: [April 19, 2022, 6:36pm UTC](https://forum.onefinitycnc.com/t/how-to-install-qcw-leveling-feet/12571/1 "2022-04-19T18:36:52Z")

</div>

The black parts are the connectors used for the holding the feet in place inside the QCW frame. Please see below for pictures showing how to install the feet:

Step 1: remove the cap on the QCW frame as shown below

 ![thumbnail_Step 1](https://us1.discourse-cdn.com/flex022/uploads/onefinitycnc/original/2X/2/20790962a13c41ad4a12d1c52d10b4af5f073b85.jpeg)

Step 2: Remove the bolts

 ![thumbnail_Step 2](https://us1.discourse-cdn.com/flex022/uploads/onefinitycnc/original/3X/9/4/94fc0baa35a15ad5bd49b3904e313e3b81141cf1.jpeg)

Step 3: install the connector for the levelling foot inside the rail opening

 ![thumbnail_Step 3](https://us1.discourse-cdn.com/flex022/uploads/onefinitycnc/original/3X/9/0/90a8886a53dd87041ca152fa6adaa060f06569e0.jpeg)

Step 4: Attach the levelling feet as the threads of the leveling foot will screw into the connector’s threads locking the foot in place.

 ![thumbnail_Step 4](https://us1.discourse-cdn.com/flex022/uploads/onefinitycnc/original/2X/b/b16bbe60c316d32d11123b4aae0ce05ed688f932.jpeg)
