I have posted this on the Masso Forum many times and its been crickets.
I would think 1F would want/help get this moving. Can someone call Masso
from the CEO office at 1F to CEO at Masso and point out that firmware V5.1 has been in beta for over 1 year , more like 1 year and 3months. What a Joke… SO what I think we ALL would like is two very basic fixes/changes.
Fix — The Gcode stops updating after 2000lines of code - Come on lets fix this
Speed override to 150%
Yes I see a lot of other changing in the readme BUT can we maybe pull out and release a version V5.08 ??? to get 1 and 2 above DONE. If I am off base then delete this, but if others are on the same page then lets “Blow” up this Topic!!
SO no I wish, The current released version is V5.07 and V5.1b has been in beta for over 1year and 3months with lots of new stuff, But I think a lot of us would like to see 1 and 2 above Like yesterday
This is what the Moderator on the masso forum replied.
SO Not helpful, If I could I would return my masso. The Masso Forum is the worst I have seen. I hope 1F is looking for a new vendor! So BAD!!
Masso Forum Reply:
Can we get a date on the release of the long overdue firmware V5.1
You will be waiting along time for version 5.1 when we are currently on v5.07 and v5.08 will be released sometime this year.
The Gcode real time issue and the speed override is very much needed…
This is available in beta version v5.100b and will be added to v5.08 when it is released.
So this morning I see my simple post to get us a date from Masso on release of V5.08 or V5.1 has been deleted (On the Masso Forum), I would say to 1F management, again find a new vendor or fix this! Everytime I run a job of 2000lines of gcode (Which is like every job) the real time update STOPS I am sure a lot of new users see this and ask the same question WHAT GIVES? SO dumb. All we are asking for is
Fix the 2000 gcode line update. ---- OR Remove Updating all together.