Thanks!! The pictures of the products help as I don’t know I need it yet…lol
I am making progress, added a monitor and mouse. Mouse while I wait on a game controller.
I can see I have wires and controllers stacking up on the edge of my table. A cabinet or metal box could be very handy. I understand and have access to ferrite rings. Most of the copiers I work on do have most all the controller pcb’s in a metal box on the back of the machine…so this does make sense to me.
So mechanically speaking I may need a metal box/cabinet, EMC filter, 5-6 relay switches, and…I know I am missing some stuff…
If there are common products users here like for this stuff and any specs about the mechanics known to work with the 1F…
