SOLD OUT! REDLINE ELITE EARLY ADOPTER PROMO PACKAGE. Only $3475 😲💥

Oh wow, I did not see this reply. Will we be notified via email or something when it ships? Or should I just keep checking my order status page everyday….As I have been doing, lol.

Alright im clearly not part of the first batch, how long will we have to wait for the next batch to start going out?

I don’t know if they sent the first batch out yet, I haven’t seen anything what number were you mine is 58037

I doubt they made it out. I’m 57931. They did say they were waiting on parts from redline. So maybe that’s the hold up

58016 here, hopefully they ship soon!

They just updated website

Rails assembled waiting on controllers. Hoping to ship next week

Just about the same thing they posted 11 days ago. Not worth getting excited until they actually have everything in house. Until then too much is out of their control to count on any estimates (they tend to be optimistic :slightly_smiling_face:).

Right now they’re at the far end of a long supply chain. Redline needs to ship but they need to get what they need from their suppliers first so 1F’s ability to ship is dependent on Redline’s suppliers’ ability to ship to Redline and then for Redline to doing whatever assembly/packaging is needed before they ship to 1F. Then 1F needs to do its assembly and packaging before they can ship to us.

Assuming Redline’s suppliers are in China, their components are possibly as much as 6 weeks away if they ship today. If they’re already enroute then on average they’d be 3 weeks out (1/2 way across the Pacific plus customs clearance). Add 2 weeks for Redline, another week to arrive to 1F and 2 more for 1F to receive, process, assemble & package. Possibly 2 months out, not “next week”.

Next week would require the parts from Redline to be onsite now and they’re already 2 weeks late based on their last post. They said they’re waiting on controllers which means the controllers are not onsite. From my logistics planning experience, their best case (controllers are delivered today) is 2 weeks out, maybe a month and possibly 2 months. Worst case is anyone’s guess.

I won’t start rebuilding my table until they report they’ve received all needed parts and are beginning assembly. :slightly_smiling_face:

Controllers are on site now. Waiting for final firmware image, testing with machines and qc checks. Thursday will be the end of 6 weeks from initial order date. We’re optimistic we will start shipping by that date!

Yay! :raising_hands: That’s excellent news.

Do we have a range for the order numbers that are being shipped this first batch or is it wait and see if you get a notification

Anyone who ordered before 10/1/25 is in the first batch.

Missed out! Here’s one last chance!

The above deal will be ‘batch 2’, so if you already have an order in before 10/1/25, you are in ‘batch 1’.

What if we ordered the Elite Foreman with a Masso controller and are waiting? Can we switch to the Redline?

Yes! If your order hasn’t shipped yet, email info@onefinitycnc.com and request a change over. (it may reset your lead time).

Do you happen to know anything about the De Minimus regulations that trump halted, effective tomorrow, and if that will impact any orders shipping?

Does anyone know how shipping anything now will be affected :slight_smile:

The De Minimus regulations made it so items under $800 in value shipped without paying taxes/tariffs. He removed the under $800 limit so everything as to pay tariffs. Shouldn’t effect a CNC order as the value was already over the $800 mark it would of already had tariffs added to it.

A side question with thoughts of someone that has ordered one of these units,

Has any of the units from batch one been sent out yet as today was the last day of week 7 from the order date?

Just a thought on stating order times I know its something sometimes out of control, but when an lead time is given of 5-6 weeks originally and now we are going into week 8 it makes people question a lot. Now seeing a second batch being sold out and that also having a lead time of 5-6 weeks. I feel like extending the lead times wouldn’t be a bad idea in future sales, As a business owner myself if I gave someone a 5-6 week lead time and was almost 2 weeks late I would have a lot of unhappy customers, If a longer lead time was given and I received it early I would feel happy and impressed with a company vs impatiently waiting and annoyed.

This all said I cant wait to get the machine and get it setup and cranking out more products!

Machines started shipping this week, as today was the last day of week 6. Also a part of why batch 2 happened today.