I am running my first project with a tool change planned in the gcode. Up until now I was running on the free version of Fusion so before I would just have a single program for each tool, bring the spindle back close to home, change the bit and re-probe the Z height and run the next one.
I don’t have the Tool Setter yet but I assume that will solve the issue which is when the program gets to the M6 line it comes back to home for the tool change which is nice. Once I swap the tool and hit go again it automatically goes to probe the Z on it’s own but in this case it’s outside of the material I am cutting so I can really set the Z height there. I had to pause/cancel the program, re-probe the Z height manually then manually force the program to start on a specific line after the tool change.
Is there a better way without the Tool Setter? Does the Tool Setter get rid of this issue?